![johns island water cad johns island water cad](https://fullsuitcase.com/wp-content/uploads/2021/05/Hurricane-Hole-in-Saint-John-USVI.jpg)
![johns island water cad johns island water cad](https://ars.els-cdn.com/content/image/1-s2.0-S0959652620342815-fx1.jpg)
This program is responsible for engineering design reviews and construction inspection of all proposed developments/subdivisions and county utility expansion projects and is the principal contact for developers, consulting engineering firms and contractors regarding water and wastewater utilities. This program is responsible for the operation and maintenance of over 380 sewer pump stations throughout the county, as well as all electrical and mechanical repairs at the well fields, water and wastewater treatment plants. The Inflow/Infiltration (I/I) Reduction Program performs smoke testing and flow testing to detect sanitary sewer system defects.We are also responsible for after hours emergency calls and respond to daily requests for locating and marking our underground infrastructure. This section installs new water and sewer pipe lines in order to reach out and serve new customers. This program is responsible for repairs and maintenance to over 1,483 miles of water, sewer, and re-use lines throughout the County.
#Johns island water cad pdf
Anastasia Island Wastewater Treatment Facility - PDF.Anastasia Island Wastewater Treatment Facility - PPT.Learn more about our Anastasia Island Wastewater Treatment Facility The total capacity of these facilities is 14.02 million gallons per day. The wastewater division maintains 9 treatment facilities throughout the County, 7 of these provide reuse water to common landscape areas of major developments and area golf courses. This program is responsible for the treatment and disposal of domestic wastewater and landfill leachate for the protection of the environment. The water division is also responsible for maintaining supply wells, water storage tanks, booster stations, and elevated storage tanks for water distribution. The Water Treatment Division maintains 9 water treatment facilities throughout the county with a total capacity of 31.18 million gallons per day. This program is responsible for the treatment and delivery of drinking water. The Department’s Principal Responsibilities are: It also administers and coordinates utility status management reporting, reviews engineering drawings, construction management and performs inspections and surveys for new construction. Johns County Utility Department is responsible for the reading, billing and collection of approximately 50,000 service connections.